G80 A342 Forged Master Link

Home / Products / G80 A342 Forged Master Link

G80 A342 Forged Master Link

G80 A342 Forged Master Link

  • Model: LF121P
  • MOQ: 10 pcs
  • Payment: T/T, L/C
  • Certification: CE
  • Delivery Time: Normally, within 20 days.
  • Start Port: Ningbo Port

SHARE

CATEGORIES: Master Link

Product Features:

All sizes are forged

Alloy steel,quenched and tempered.

Proof load at 2 times Working Load Limit

Surface Finish:Powder Plasticized

Regular mark:Size, WLL

Package: Carton, Plywood/Steel pallet

For chain sling:Minimum ultimate load is 4 times working load limit

For steel rope sling:Minimum ultimate load is 5 times working load limit


G80 A342 Forged Master Link

Model
LF121P
MOQ
10 pcs
Payment
T/T, L/C
Certification
CE
Delivery Time
Normally, within 20 days.
Start Port
Ningbo Port